• info@associatedinstallations.co.uk
  • 0208 709 0066

Banking & Finance

2014 - Terra Firma

Santander, Terra Firma, 86 Station Road, Redhill, RH1 1PQ

Read More
 

Commercial

2013 - One Carter Lane

Balfour Beatty Construction, 1 Carter Lane, City of London, London, EC4V 5ER

Read More
 

Education

St Josephs Fire Reinstatement

Following a major fire that started on the flat roof of the above‐mentioned school, a fire started and spread and devastated the whole of the second floor. The fire brigade attended and proceeded to extinguish the fire where the rest of the school was devastated by the water.

The works consisted of removal of all existing damaged structure, fixtures, fitting, ceilings, mechanical and electrical services. Following the demolition stage full reinstatement works including new steel roof structure, new roof coverings, external envelope repairs, new internal floor slabs, new internal walls, mechanical and electrical services as well as all internal finishes.

Stakeholders consisted of, architect, structural engineer, M&E consultants, loss adjustors, insurers, Diocese of Westminster (client).

Read More
 

2020 - Margaret Beaufort, Institute of Theology

Internal modifications to provide new and improved student accommodation.

Works included, asbestos removal, demolition and soft strip to all areas of work, structural steel works to accommodate new layout. New Roof coverings including roof lights, loft hatch, man safe system and rain water guttering. Contractors design portion included design and installation of internal steel stair case. This included close liaison with Building control due to the existing area being small and unable to meet the correct going and riser sizes to meet building regs. New walls including masonry and internal partitioning. New internal and external windows and doors. New ceilings including all fire breaks. New Mechanical and Electrical installation including fire breaks. Painting, decorating, flooring, and 2nd fix carpentry.

Read More
 

2015 - St Dominic's Catholic, Primary School

Ballance Road, Hackney, London, E9 5SR

Read More
 

2011 - St. Mary's Church, Pre-School

This major construction provided St. Mary’s School with a nursery facility on part of their playing field.

The six-month project required Associated Installations’ teams to liaise with suppliers to connect all utilities across the field to the new building which we constructed from the ground up.

Our professionals can assist in the planning of your new space and can advise on how to get the most out of your new or remodelled facilities.

Read More
 

2010 - St. Michael's Pre-School

The school commissioned Associated Installations to design and construct an extension to their existing building. The work included knocking through from the old to the new structure, remodelling the completed space and ensuring the two parts of the building were blended together visually from the outside.

Our team was able to work in tight conditions and without interrupting the school’s lessons during the two-phase, year-long project.

Being a specialist contractor in the education sector, Associated Installations is able to work flexibly and in close liaison with headteachers and governors to ensure the smooth-running of your works.

Read More
 

2010 - Cranleigh School

Working as a subcontractor, Associated Installations was commissioned to supply and fit washrooms, cubicles, sanitary ware and framework for Cranleigh School.

Our job was to turn an empty room into a functional, practical and attractive bathroom area.

As subcontractor, Associated Installations still pays the same care and attention to the job at hand, carrying out a full site survey and double checking all dimensions, fixtures, fittings and plans before starting work.

The project at the private secondary school was completed within six weeks.

Read More
 

Finchley Catholic High School

The project was for the complete catering kitchen refurbishment which is located on the ground floor of the Fisher Building. These works included but not limited to a complete strip out back to substrate, replacement of all catering equipment specifically designed for the schools’ requirements and number of students. New flooring, ceilings, mechanical and electrical upgrade including ventilation and fire suppression system, staff toilet and changing rooms upgrades.

Read More
 

Health Authority

BPAS Professional

We was instructed as main contractor for the redevelopment of an old school building to facilitate a new IVF Clinic over 3 floors.

These works consisted of structural remodelling and internal refurbishment to produce treatment rooms, recovery rooms, meeting rooms, office space, counselling and consulting rooms.

M&E works had to be designed and installed to facilitate the laboratories, cryogenic storage, UPS back up, new plant rooms, mechanical ventilation, lighting, small power, intruder, fire, access control and the like. Project value £1.1m.

Read More
 

2013 - Thistlemoor Endoscopy Centre

As main contractor to client Prime Diagnostics private health care, Associated Installations converted three flats into a functioning endoscopy unit.

Working to all current regulations and standards, our teams spent eight weeks providing all mechanical and electrical works, installing new walls, ceilings and floors as well as air-conditioning, ventilation and washrooms.

Being a specialist contractor in the health sector, Associated Installations appreciates every detail has to be perfect and standards and quality have to be second to none.

Read More
 

New Build

St Lawrence

Junior Playground Build. The ground works and footings have been built for our new classroom block. Over the next few months these classrooms will take shape. We hope to be able to move children into these before the end of the academic year.

Read More
 

St Anne's & Guardian Angels

When St Anne’s and Guardian Angels amalgamated in September 2020, they were promised funding from the LA to improve the layout of the school. These were delayed for over a year due to the pandemic. The remodelling of Reception classroom, increasing the size of the two 1year classrooms, relocating the two Year 2 classrooms (Y4 and Y3 into 2 larger Year 3 classrooms with a new toilet block. The whole school is also being rewired. The LA are working very closely with the Diocese who has also agreed to invest in this project

Read More
 

Leisure

West Norwood Leisure Centre

West Norwood Health and Leisure Centre is a welcoming community hub dedicated to health and wellness. This leisure centre boasts an 80-station gym, and fitness studio, and is part of an integrated health and wellbeing centre incorporating a GP and dental practice, Lambeth Council customer centre, community health services and community space for hire.

Read More

Call us to discuss your next project